RIB CANDY: ESTIMATING, PLANNING AND PROJECT CONTROL

RIB Candy: Estimating, Planning and Project Control

Construction estimating, planning and project management software focused on project control. RIB Candy links the Bill of Quantities and estimate to the programme, so time and money stay aligned from quantity take-off to the final certificate.

Inside RIB Candy

Estimating, Planning and Project Control in One Solution

  • Links the Bill of Quantities and estimate to the programme, so time and money stay aligned
  • Combines its features in a single user interface, eliminating departmental silos
  • Versatile and scalable: used by small, medium and large entities
  • Dynamic integration with RIB BuildSmart for purchase control and budget vs cost analysis

What Is RIB Candy?

Part of RIB CanBuild, which manages the entire construction and engineering process.

RIB Candy is unique, powerful and dynamically focused on project control in the construction and engineering industry. It targets the contractor's requirements: quantity take-off, pricing and planning a project, controlling at site level, through to the final certificate.

It gives an interactive link between the Bill of Quantities (BOQ) and estimate and the programme or schedule of work in one construction project management solution. Put simply, it aligns time and money, so management and client alike have a wealth of information at their fingertips.

Benefits at a Glance

  • Combines its powerful features in a single user interface, eliminating departmental silos
  • Based on best business practices and processes
  • Versatile and scalable: used by small, medium and large entities
  • Tender and project analysis reports that give you the competitive edge
  • Powerful yet user-friendly: work the way you think
  • Substantially improves speed, accuracy, transparency and auditability of estimation and project controls, while considerably reducing mistakes
  • Minimal hardware specification and IT infrastructure required
  • Low cost of activation and ownership
  • Eliminates paper usage and manual processes
  • Enhanced and developed continually in line with user requirements and industry and technological trends
  • Dynamic integration with RIB BuildSmart for upfront purchase control (procure-to-pay) and accurate budget vs cost analysis and reporting

Where RIB Candy Fits in the Wheel

RIB Candy covers the Bid stage from quantity take-off to planning, then forecasting, cashflow and valuations once the contract is won.

1Bid

  • Quantity Take-off
  • Estimating
  • Planning

2Contract

  • Forecasting and Cashflow
  • Valuations
  • Reporting

3On Site

  • Subcontractor Management

Explore the full RIB CanBuild wheel on the home page →

Who We Serve

The same role-by-role benefits are listed in the RIB brochure for both products.

Estimators

  • Higher success rate on budgets, bids and estimates
  • Reduced risk of mistakes due to improved accuracy
  • High-speed calculation allows rapid assessment of alternative strategies
  • An easy-to-use, all-in-one system resulting in quick turnaround time on estimates

Planners

  • An easy-to-use, all-in-one system for scheduling and planning
  • No more time-consuming manual checking
  • Better decision making due to accurate analysis
  • Integration with Estimating for forecasting and cashflow

Commercial and Project Delivery Team

  • Seamless continuity between estimating and post-tender commercial control
  • Real-time analytics, cost reporting and dashboarding
  • Timely, effective and powerful decision making based on real-time, accurate information in one click

Procurement Manager

  • The complete procurement process in one system
  • An effective communication tool for both buyers and suppliers
  • Real-time order status and inventory availability information
  • Web-based, accessible from anywhere, anytime

Accounts Department

  • A simple-to-use, all-in-one system with multi-user access and role-based permissions
  • Multi-company, multi-currency features for global compatibility
  • Real-time costing with live accrual allocation
  • Inter-company transactions, reporting and consolidation

Plant and Equipment Manager

  • Tailor equipment management to your needs: by location, availability, utilisation and costs from multiple workshops
  • Accurately track and safeguard your assets
  • Maximise asset utilisation to boost your efficiencies and ROI

Stores Manager

  • Web-based system, accessible from anywhere, anytime
  • You save time and money through better inventory organisation
  • Quickly see and react to surplus inventory
  • Detailed reports provide clearer insight into the organisation's resources

Payroll Manager

  • Handles even the most complex calculations
  • Flexible payroll types, pay periods and earning and deduction sets
  • Informative and instantaneous reporting
  • User-defined parameters

HR Manager

  • All employee data in one place
  • Electronic Approval System (EAS) and Employee Self-Service (ESS) facilities
  • Mass capture facility
  • Camp management
  • Allows for accurate statistics and reporting across groups, companies and payrolls

C-Level and Executive Management

CEO, CFO, COO, GM, Commercial Director, Contracts Director, Owner, President, Board of Directors

  • Enhanced cost and schedule performance and certainty
  • Accurate and appropriate information in real time
  • Proactive management of complex projects
  • Increased productivity
  • Proactive management of project risk
  • Improved financial returns with lower volatility

Industries and Contractor Types

General ContractorSpecialist SubcontractorCivilBuildingsEPCM / ConsultingIndustrialInfrastructureMarineMEPMiningOil and GasPower and Energy

RIB CANDY MODULE 01

Quantity Take-off (QTO)

On-screen take-off from 2D drawings or models, dynamically integrated with RIB Candy's Estimating and Project Control components.

Take-Off Without the Time Sink

Quantity take-off is one of the most important elements of estimating, but it can be time-consuming with significant room for error. The QTO module lets you add or extract quantity information from 2D drawings or models and compile Bills of Quantities electronically.

An Accurate Foundation

Fully integrated with RIB Candy's Estimating and Project Control, QTO gives an accurate foundation for your estimate, progress and final account measurements.

Key Features

  • Enjoy the latest updates
  • On-screen 2D take-off
  • Multiple file formats supported
  • Templates and master templates
  • Configurable layouts
  • Dynamic link with BOQ

Benefits at a Glance

  • Measure multiple bill items using common dimensions
  • Dynamic link and references to the BOQ
  • Auto-extraction of quantities and properties from file formats
  • Enables the user to remeasure revisions and variations
  • Progress the BOQ using drawing markups
  • User-customised templates for fast, accurate and efficient measurement of repetitive items
  • BIM-enabled

RIB CANDY MODULE 02

Estimating

RIB Candy Estimating standardises the estimating process in the contractor's office. It is well established worldwide in the construction industry and is updated regularly to meet user requirements and new tendering conditions.

Pricing

Price a bid rapidly and accurately, quickly identifying the critical elements of a tender. Pricing libraries support consistent, well-documented rate build-ups, and changes are made in a controlled manner. eBills of Quantities keep sections, specifications and multi-line descriptions, and item description libraries and electronic bill importation reduce bill capture time. You can also create your own bill from masters or from the QTO module.

Subcontractors

Relevant bill items are copied to the Subcontract Adjudicator for quotation comparison, and the selected subcontract rates are transferred to the main bill so the original items can be priced. A similar facility is available for materials.

Alternative Tendering

Carry out all the pricing in one estimate while maintaining up to eight alternative estimates, in which different estimating alternatives can be considered.

Indirect Costs

Indirect costs are priced in a separate bill within the estimate, using the tools of both Estimating and Planning, to give a priced bill that changes with the indirect programme.

Free-Format Worksheets

Item rates are built up on a free-format analytical worksheet using resources and production calculations, in a manner very similar to manual methods, so everyone at estimating and construction stage understands how the estimate is made up.

Resources

Simple resources reflect the purchase cost of an item in any currency, and composite resources are made up of other resources. Price items by a net rate or split a rate into user-defined components such as labour, material and plant. Multiple levels of composite bill items are supported.

Markup

Net rates can be marked up by item, trade, page range or resource type. Local and foreign rate components can be marked up separately for multi-currency bills.

Reports

A wide range of standard reports is available, while Report Managers create customised, presentation-quality and tailored management reports.

Integrated Estimate and Programme

Allocate items from the bill of quantities to programme activities to get an accurate forecast of the bill and a cost-loaded programme. Forecasts can be produced for bill item value and quantity, individual resources or summary cost code level, and any change to the programme or the estimate is reflected immediately.

Immediate Forecast Cashflow

Once the estimate and programme are linked, detailed information can be transferred into the cashflow module, so no items are omitted and the cashflow figures balance with the estimate. Tender alternatives are easy to test, and the latest bid figures are included as they become available.

Tender Finalisation

Powerful tender finalisation reports let management make informed decisions and last-minute changes with confidence. High-speed calculation allows rapid assessment of alternative strategies.

Key Features

  • Electronic bill importation
  • Free-format, first-principles pricing worksheet
  • Resource-based analytical estimating
  • Multiple and customisable document layouts
  • Powerful filtering, sorting and grouping of data
  • Master pricing and reference libraries
  • Pricing templates
  • Simple and complex resources
  • Indirect costing
  • Alternative estimates and elemental pricing
  • Multi-user functionality
  • Multi-currency control
  • Subcontract and material adjudication
  • Multiple markups and finalisation
  • Comprehensive standard and customisable reports

Benefits at a Glance

  • User-friendly with minimal training requirements
  • Designed specifically for estimating and tendering purposes
  • Significant time and cost savings
  • Improved bid management and success
  • Reduced risk of mistakes and improved accuracy
  • Production, resource, man-hours and wastage analysis and reporting
  • Integrates with QTO, Planning, Cashflow, Valuations and RIB BuildSmart Procurement

RIB CANDY MODULE 03

Planning

RIB Candy Planning is a powerful critical path networking system designed specifically for the construction industry. It can be used effectively by a non-planner, but has the features and functionality required by the professional.

Flexible

Draw a bar chart, maintain a detailed precedence network, or combine the two. The network may be entered in a precedence fashion or as a linked bar chart that automatically creates the precedence network.

Intuitive

Network loops and activity duplication are checked as activities are entered, reducing input errors and time-consuming manual checking.

Detail

Activities can carry notes and comments for annotating programme reports or recording site conditions. Networks can be split into any number of subnetworks across nine levels, then grouped into logical sections and closed in summary form until required.

Organising

Powerful filtering mechanisms filter activities by code, description, float or any user-specified data.

Resourcing

Resources are categorised into simple and gang resources and allocated to activities, to assess and manage the resource requirements of the project. Resources are analysed using on-screen and report histograms.

Progress

Record progress to provide an as-built record of a project, while the original network is kept as a base programme to compare against actual progress.

Information Schedules

Auxiliary Long Lead and Information schedules are dynamically linked to the programme, for tracking and recording off-network operations such as client decisions, design work and lengthy delivery items.

Time/Location

A chart that summarises and graphically represents a programme against axes of time and location. It suits the linear activities typically found in programmes for high-rise buildings, roads and rail lines.

Integrated Estimate and Programme

Allocate items from the Bill of Quantities to programme activities, so resource or financial information from the estimate is reflected against the time frame calculated in the programme. BOQ resources can also be plotted as histograms, and changes to the programme or the estimate are reflected in the forecast and histogram.

Key Features

  • Critical path, precedence networking
  • On-screen bar chart
  • Multiple and customisable document layouts
  • Powerful filtering, sorting and grouping of data
  • User-defined and WBS coding
  • Multiple calendars
  • Resource allocation and graphing
  • As-built progress
  • Information schedules
  • Long lead schedules
  • Interactive time-location charting
  • Comprehensive standard, as-seen and customisable reports

Benefits at a Glance

  • Planning and scheduling in one system
  • Powerful yet user-friendly
  • Effective reporting on the project status across all levels
  • Fewer input errors and less time-consuming manual checking
  • Auxiliary long lead and information schedules for tracking and recording off-network operations and responsibilities
  • Resource planning and levelling
  • Integration with Estimating for forecasting and cashflow

RIB CANDY MODULE 04

Forecasting

The Forecasting module forecasts quantities, values and resources, using estimate and valuation information combined with time from the construction programme.

Integrating the Bill of Quantities with the Programme

RIB Candy can dynamically link the Bill of Quantities with the programme. Items are allocated to the corresponding activities, and bill quantity can be spread or offset over part of an activity duration, giving accurate Forecast Budget and Forecast Cashflow data for cashflow analysis.

Forecasting the Bill and Resources

Once the link is established, financial and engineering information from the estimate and valuations can be forecast over time. Each bill item's quantity, resource and financial data is allocated to time.

Summarising into Project Codes (With, What and Where)

Summarise bill items and resources into one or more cost codes. The three industry-standard approaches to controlling a construction project are provided: resource-based (with), location (where) and task-orientated (what).

Forecasting the Summary Cost Codes (When)

Using the bill-programme link, the "when" control measure is available too, so control of what is being done, where, with what resources and when is readily available.

Forecasting Allowable

Once the Bill of Quantities and programme are updated, the remaining allowable is calculated and spread across the remaining time.

Base Forecast

An agreed initial forecast can be stored and locked for comparison with future performance, and updated at user-defined intervals using historical data and the work that remains.

Engineering Information

As well as financial information, RIB Candy generates engineering information, such as total quantity of resources and total man-hours for the project codes, to support decisions on site.

Forecasting Made Simple

Once the link is in place, a full analytical breakdown of the forecast is readily obtained. The bill of quantities and programme are updated monthly, which in turn updates the Cost and Allowable module automatically.

Benefits at a Glance

  • Provides invaluable information for feasibility and progress monitoring of a construction project
  • Assists in assessing the effect of changes to the project financing and helps focus on the important issues
  • Produces graphical and numeric histograms and s-curves for resource, quantity, budget and revenue forecasts
  • Provides source data for cashflow modelling and forecast costing
  • Forecasts and manages multi-currency requirements
  • Forecasts and manages manpower requirements

RIB CANDY MODULE 05

Cashflow

RIB Candy Cashflow models the financial requirements of a construction project, so that cashflow can be optimised, readily assessed and controlled.

Payments

Specify lags on payment of invoices to suppliers and subcontractors, together with predicted escalation on cost and value. Interest rates, retention rules, pre-payments and other factors can be specified to model the cashflow.

Receipts

Valuation payments from the client can follow normal certificates or a predetermined milestone payment plan, or certificates can be limited to preset monthly maximums.

Net Present Value (NPV)

NPV is generated from the weekly cashflow calculations and can be viewed from the client's or the contractor's perspective. Weekly results of cashflows and bank balances are produced, together with monthly valuations and cost figures.

Currencies and Exchange Rates

Like Estimating, Cashflow handles foreign currencies and accepts data from Estimating in multiple currencies. The exchange rate between each currency and the pricing currency can vary over time, to examine the effects of currency fluctuations on a project.

Integration with the Bill and Programme

Cashflow imports data from the Bill of Quantities or the Bill of Quantities/Programme link, or data can be entered manually. It calculates a financial model of when payments for labour, plant and material fall (outflows) and when the concurrent revenues are received (inflows). Testing models with different parameters and comparing NPV results helps determine the optimum tender strategy to maximise return on investment.

Key Features

  • Create manually, from estimate or forecast
  • Specify cashflow parameters such as days, weeks and months
  • Incorporate payment lags, escalation, interest, NPV, advances and loans
  • Main and subcontractor retention options
  • Multi-currency and exchange rate modelling
  • Combine multiple cashflows
  • Financial modelling and feasibility of projects
  • Weekly and monthly forecast cashflow analysis and reporting

RIB CANDY MODULE 06

Valuations

RIB Candy Valuations provides continuity between Estimating and post-tender commercial control. All the information used to price the tender is immediately available at post-award, and all post-tender commercial functions can be carried out by site-based staff.

Job Modelling

Rapidly remodel the tender information to reflect situations that have arisen since submission. Buying savings, production adjustments and subcontract revisions can be incorporated, and new budgets and forecasts prepared quickly and accurately.

Subcontractors

Copy rated items from the estimate to the subcontract adjudicator to compare quotations received after the contract is awarded, then transfer the preferred rates back to the main contract document.

Subcontract Liability

Items are copied from the Subcontract Adjudicator and the Valuation Bill to the Subcontract Liability module, and variation items entered on the bill can be added to the liability document automatically.

Forecast to Completion

The integration of Estimating and Planning enables monthly forecasts of cost and value to completion, using the unique link between time and money.

Allowable Cost Reconciliation

Collect bill items under project codes to produce resource-based, locational and task-orientated cost, production and quantity analyses, in a format compatible with the site costing system or exported to a spreadsheet or accounting system for the monthly operating statement.

Reporting

The Report Manager produces presentation-quality reports for external use, and a wide range of standard reports gives detailed analyses for internal use.

Monthly Valuations

Produce monthly applications for payment by entering a progress quantity or a percentage complete against progressed bill items, with measurement sheets to record the build-up. Available progress quantities are Claimed, Paid and Actual, plus derived quantities such as Quantity to Completion.

Analytical Pricing of Variations

Add variation items to the original contract document by pricing them with free-format analytical worksheets from the estimate, building them up from first principles, or entering a split rate. All items can have both internal and external rates.

Engineering Information

Valuations also provide essential engineering information as a by-product, with full analytical detail of the budgeted use of resources for any part of the project or code structure. This is particularly useful on Partnership or Open Book projects.

Feedback to Estimating

Valuations start a useful interaction between the site commercial team and the estimating department, and accurate, regular feedback provides a competitive advantage.

Key Features

  • Immediate use of estimate data
  • Multiple and customisable document layouts
  • Powerful filtering, sorting and grouping of data
  • Comprehensive standard and customisable reports
  • Value engineering / job remodelling
  • Interim payment claims
  • Internal and external valuation quantities and variance analysis
  • Variation order management
  • Measurement by areas
  • Dynamic link with QTO
  • Dynamic link with Subcontract Manager

Benefits at a Glance

  • Provides continuity between Estimating and post-tender commercial control
  • Tender information can be rapidly remodelled to reflect changes since tender submission
  • Variation and re-measurement pricing and control
  • Production, resource, man-hours and wastage analysis and reporting for better control
  • Dynamically integrates with RIB BuildSmart Procurement

RIB CANDY MODULE 07

Subcontract Manager

RIB Candy's Subcontract Manager controls progress quantities and provides a rolling subcontract progress update. It supplies information on the subcontractor bill as well as other costs, claims, charges, on-site materials and variation orders.

Managing Subcontractors

Subcontract management is a vital operational process of project management, and this module brings every element together to manage multiple subcontractors, maintain their bills, and assign them specific subcontracts and other costs. Standard and customisable reports give real-time information and subcontract progress updates for a complete overview of your labour resource.

Key Features

  • Dynamic link with Subcontract Adjudication
  • Multiple subcontractors per bill item
  • Subcontract bills linked to main BOQ
  • Extras, charges, MOS (materials on site) and advance payments control
  • Subcontractor progress measures
  • Subcontractor certificates
  • Comprehensive standard and customisable reports
  • Subcontract liability reporting
  • Integrated with RIB BuildSmart subcontractor payments

Benefits at a Glance

  • Subcontracts already set up and priced in the Subcontract Adjudication system can be brought directly into the Subcontract Manager, including rates from a chosen subcontractor
  • Multiple subcontractors can be allocated to a bill item, each with their own quantity and rate
  • Weekly, bi-weekly and/or monthly payment certificates using company-specific Excel templates
  • Upload the bill for full integration with RIB BuildSmart Procurement to produce subcontractor purchase orders
  • Dynamic upload of subcontractor reconciliations for approval and payment processing in RIB BuildSmart

RIB CANDY MODULE 08

Cost and Allowable

RIB Candy makes Earned Value Management (EVM) simple with its cost control capability. EVM provides a series of curves and their derivatives for the control and measurement of a project's performance, forecasting and tracking Allowable and Cost against a Baseline budget.

Construction Cost Reporting

Construction cost reporting is an ongoing process that includes accurate forecasting of project performance problems. The reporting module offers actual/allowable cost comparison and projected cost and time to completion data for accurate Earned Value Management reporting. With flexible filter parameters and customisable document layouts, you can quickly assess transparent data for quicker decisions.

Key Features

  • Multiple and customisable document layouts
  • Powerful filtering, sorting and grouping of data
  • Cost rates and cost worksheets for cost-to-completion and cost-at-completion calculation
  • Import cost and cost adjustments from various file formats
  • To-date, to-completion and at-completion project performance analysis
  • Production, average rate and man-hour comparison and analysis
  • Fixed and re-measurable project control
  • Comprehensive standard and customisable reports
  • Generate cost reports

Benefits at a Glance

  • Real-time analytics, cost reporting and dashboarding for effective and powerful decision making
  • Locational and/or activity and/or ledger cost vs budget to date
  • Locational and/or activity and/or ledger cost vs budget to and at completion
  • Quickly assess and evaluate the impact of escalation and variation orders
  • Comprehensive Earned Value Management and KPI measurement
  • Integrates with RIB BuildSmart for actual cost data

Want to Estimate, Plan and Control Projects Like a Pro?

See RIB Candy on a job like yours.